VYPR
Vendor

Critical Path

Products
2
CVEs
4
Across products
6
Status
Private

Products

2

Recent CVEs

4
  • CVE-2002-0786Aug 12, 2002
    risk 0.03cvss —epss 0.03

    iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.

  • CVE-2002-0787Aug 12, 2002
    risk 0.03cvss —epss 0.03

    Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters.

  • CVE-2001-1314Jul 16, 2001
    risk 0.00cvss —epss 0.05

    Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.

  • CVE-2001-1315Jul 16, 2001
    risk 0.00cvss —epss 0.04

    Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.